Foundation construction steps of water-based terrace

发布日期:2021-04-14

1. Base treatment


Clean the ground, remove the cement pimples and loose shelling; clean the dust and particles in the construction joints, cut the irregular cracks into V-shaped joints, and level them with epoxy mortar. Make the foundation flat and solid, and then use a professional dust-free grinder to polish and vacuum;



2. Apply epoxy sealing primer


Objective: to penetrate concrete base, ensure the combination with concrete, and improve the adhesion of concrete base.


Construction requirements: thin and even without omission


Construction method: after the ground is polished and cleaned, directly brush the undercoat on the ground. Before construction, calculate the amount of materials to be used and evenly coat. Pay attention to the balance between the construction progress and the materials to be used when batching. Do not open too much materials at one time to ensure that the materials still meet the available time when painting. Brush them before gelatinization to keep good permeability and bonding performance. The purpose of bottom coating is to close the base surface and enhance the adhesion. Generally, it should be cured for more than 12h. After confirming the curing, the next process can be carried out.


3. Construction of middle coat mortar layer (the thickness and flatness of mortar layer can be increased)


Objective: to improve the smoothness and wear resistance of epoxy floor.


Construction method: mix the Guanglei intermediate coating material according to the correct proportion, then slowly add quartz sand, mix evenly, first make up the low concave defects on the base surface; then use a scraper to evenly coat the epoxy intermediate coating material on the ground, and then polish and dust after it is fully cured. After cleaning, the next process can be carried out.


4. Apply epoxy putty layer


After mixing the Guanglei intermediate coating material or surface coating material according to the correct proportion, slowly add quartz powder or talcum powder, and use epoxy putty (fine powder, thinner, better leveling) to level the base surface with leveling method. The purpose is to adjust the flatness and fineness of the base surface. After confirming the curing, the next process can be carried out.



5. Roll coating


Objective: to improve the impermeability and wear resistance of epoxy floor, and to obtain a bright color surface.


Construction method: after curing, the epoxy putty shall be polished, polished, cleaned and vacuumed. After mixing the surface coating materials in the correct proportion, the scraper shall be used to scrape and paint once first. After curing, the defects shall be repaired and then the roller shall be used to roll paint for the second time to cover the roller traces left during the first roll coating of epoxy paint and make the color paint more uniform.


Environmental requirements for coating construction: the construction base surface shall be kept clean, and there shall be no cross operation of other engineering construction.



6, conservation


After finishing the surface coating, the relevant construction materials and tools shall be removed from the site, and the finish shall be tightly sealed and protected. At least 24 hours later, people are allowed to walk. It is not allowed to bring in sediment. Generally, it takes 7 days for the paint film to fully solidify. During this period, other engineering construction, transportation, installation and other construction shall be avoided.


推荐品牌

  • 塑胶跑道
    塑胶跑道
  • 人造足球场
    人造足球场
  • 塑胶篮球场
    塑胶篮球场
  • 网球场
    网球场
  • 羽毛球场
    羽毛球场
  • 幼儿园地面
    幼儿园地面
  • 排球场
    排球场
  • 硅PU
    硅PU
  • PVC
    PVC
  • 丙烯酸
    丙烯酸
  • 木地板
    木地板
  • 悬浮地板
    悬浮地板
  • EPDM橡胶颗粒
    EPDM橡胶颗粒
  • 人造草皮
    人造草皮
  • 移动拆卸式球场
    移动拆卸式球场
  • 广东省
    广东省
  • 广西省
    广西省
  • 湖南省
    湖南省
  • 江西省
    江西省
  • 海南省
    海南省
  • 福建省
    福建省
  • 云南省
    云南省
  • 贵州省
    贵州省
  • 浙江省
    浙江省
  • 安徽省
    安徽省
  • 湖北省
    湖北省
  • 重庆市
    重庆市
  • 四川省
    四川省
  • 陕西省
    陕西省
  • 河南省
    河南省
  • 江苏省
    江苏省
  • 山东省
    山东省
  • 河北省
    河北省
  • 山西省
    山西省
  • 甘肃省
    甘肃省
  • 宁夏省
    宁夏省
  • 天津市
    天津市
  • 北京市
    北京市
  • 上海市
    上海市
  • 球场翻新
    球场翻新

最新文章

  • 足球场人造草坪多少钱一平米
    足球场人造草坪多少钱...
  • 建一个足球场需要多少钱 揭秘!
    建一个足球场需要多少...
人工草皮足球场价格多少?
足球场假草皮多少钱一平方米
人造草足球场草坪多少钱一平方米
什么是人造草坪足球场?
3mm丙烯酸球场造价
建一个网球场需要多少钱
网球场施工材料价格
篮球场pvc塑胶地板价格

最新TAG

  • 河源室内篮球场在哪里
  • 篮球场地面投影
  • 洛克室内篮球场
  • 篮球场地 上门
  • 龙津西路室内篮球场
  • 常州室内篮球场团购
  • 萧山哪有室内篮球场
  • 葫芦岛篮球场室内
  • 启明室内篮球场地址
  • 重庆2020室内篮球场

最新专题

  • 足球场人造草坪多少钱一平米
  • 建一个足球场需要多少钱 揭秘!
  • 人工草皮足球场价格多少?
  • 足球场假草皮多少钱一平方米
  • 人造草足球场草坪多少钱一平方米
  • 什么是人造草坪足球场?
  • 3mm丙烯酸球场造价
  • 建一个网球场需要多少钱
  • 网球场施工材料价格
  • 篮球场pvc塑胶地板价格
热销产品
文章资讯相关热点
  • 文章资讯
  • 关于我们
订阅

奥宏体育专注塑胶跑道施工、足球场施工、篮球场建设、网球场施工、羽毛球场施工、幼儿园塑胶跑道
© 2005-2026 广州奥宏体育 版权所有,并保留所有权利。
ICP备案证书号:粤ICP备20008481号
网站地图